Add:

Tai’an Road, Linshu, Linyi City , Shandong

Shantian abrasive Co., Ltd.
Your present location:
Homepage
/
/
Photovoltaic one-stop service platform
Metallic silicon
Ordering Hotline:
+86-0539-6282288
+86-0539-6281222
Details 白箭头 黑箭头
Diamond wire
Ordering Hotline:
+86-0539-6282288
+86-0539-6281222
Details 白箭头 黑箭头
Diamond powder
Ordering Hotline:
+86-0539-6282288
+86-0539-6281222
Director Ma (0)15969931138
Details 白箭头 黑箭头
Silicon carbide powder
Ordering Hotline:
+86-0539-6282288
+86-0539-6281222
Director Ma (0)15969931138
Details 白箭头 黑箭头
Silicon carbide ceramics
Ordering Hotline:
+86-0539-6282288
+86-0539-6281222
Details 白箭头 黑箭头
Photovoltaic one-stop service platform
Ordering Hotline:
+86-0539-6286666
Details 白箭头 黑箭头
Previous page
1
1
1

Photovoltaic one-stop service platform

Ordering Hotline:
+86-0539-6286666
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Category
Product
Quantity
-
+
Stock:
0
产品描述
Parameters
  Project Introduction
  Shantian Abrasive Materials Co.,Ltd.has the third-level power engineering general contracting and the fourth-level qualification for installation(repair,test),and has a construction safety production license.Mainly undertake photovoltaic sales,design,installation,wind power generation,power generation projects with a unit capacity of 100,000 kilowatts and below,110 kilovolts and below transmission lines and the construction of substation projects of the same voltage level.In recent years,it has successively undertaken photovoltaic poverty alleviation projects and industrial,commercial,and household distributed power station businesses in Linshu,Junan,Tancheng,Feixian,Donghai and other places.The total installed capacity has reached 30MW.It has formed a foothold in Linshu,radiating surrounding areas,and expanding The development pattern outside the province.
  In the process of one-stop service for photovoltaic power plants,the company exerts its personnel and technical advantages to create high-quality projects one after another,which has been praised by the people and highly recognized by the government.
  Well-designed.The company has an engineering technology department with more than 10 professional technicians in construction installation and power design.The engineering department conducts on-site surveys and measurements according to the customer’s room type and structure,with the smallest investment,the best power generation efficiency,the strongest stability,and the safety factor.The highest principle is to determine the construction plan.
  Scientific construction.Yamada Photovoltaic has established strategic partnerships with domestic first-class photovoltaic companies such as Trina,Longi,Sungrow,Dahai New Energy,and carefully selected photovoltaic modules and inverters with high power generation efficiency,long service life,and safety and stability to ensure the project the quality of.The Yamada Photovoltaic construction team has good technology and high efficiency.It insists on"doing a project and setting up a banner",using the spirit of craftsmen to control every link of the construction,so that every joint,every component,every screw is in the best State,and strive to make every project a model project.All of the photovoltaic projects undertaken by the company for the 2019 fiscal special poverty alleviation fund in nine towns and streets in Linshu County passed the acceptance inspection at one time.
  Professional operation and maintenance.In order to solve the customer's worries,Yamada Photovoltaic has established an operation and maintenance team composed of more than 20 professionals to monitor the power generation of the customer's power station through the network platform and daily inspections,and solve the problem within 24 hours.At present,the company has undertaken professional operation and maintenance services for more than 10 poverty alleviation projects in surrounding areas such as Linshu,Junan,Tancheng,Luozhuang,and Lingang.
  Photovoltaic power generation,low investment,quick results,one-time investment,long-term benefits,and a service life of 25 years.Industrial and commercial photovoltaic power plants recover costs in about 3 years,and household distributed photovoltaic power plants recover costs in about 5-6 years.Yamada Photovoltaic has always adhered to the great dream of"Let solar energy benefit all mankind",and strive to build a one-stop photovoltaic one-stop service benchmark enterprise that is assured by the government and trusted by the people with first-class technology and quality services.
 
  Qualification
ss
  Engineering case

Serial number

Purchasing unit name

Purchasing content

Total installed capacity

Total contract price

Contract signing time

1

People's Government of Shimen Town, Linshu County

The People's Government of Shimen Town, Linshu County's 2018 fiscal special poverty alleviation fund photovoltaic project (second time)

874.16kw

5 million yuan

2018.6.26

2

People's Government of Daxing Town, Linshu County

2018 Annual Financial Special Poverty Alleviation Fund Photovoltaic Project in Daxing Town, Linshu County

837.48kw

4.8 million yuan

2018.6.28

3

People's Government of Hongzhuang Town, Donghai County

Hongzhuang Town People’s Government builds a new 90KW distributed photovoltaic power generation procurement project

91 kilowatts

750,000 yuan

2018.9.13

4

Tancheng Sub-district Office, Tancheng County

Tancheng Street Photovoltaic Poverty Alleviation Project

86.35kw

500,000 yuan

2018.10.1

5

The People's Government of Lingquan Town, Junan County

Qichahe Village and Xiaoguanzhuang Village, Qichahe Village, Xiaoguanzhuang Village, Lingquan Town, Qiguang Photovoltaic Agricultural Professional Cooperative of Junan County

93.19kw

550,000 yuan

2018.12.3

6

Feicheng Sub-district Office, Fei County

2018 East-West Cooperation Assistance Fund Photovoltaic Project of Philadelphia Sub-district Office, Feixian County

180.125kw

1 million yuan

2018.12.17

7

Linshu County Leading Group for Poverty Alleviation and Development

Nine towns and streets of Linshu County, 2019 fiscal special poverty alleviation fund photovoltaic project

913.88KW

4.04 million yuan

2019.11.29

8

The People's Government of Lingquan Town, Junan County

66.69KW and 171KW photovoltaic power generation project of Guanzhuang Doctor Primary School, Lingquan Town, Junan County

237.69 kilowatts

1.2 million yuan

2020.1.12

9

People's Government of Huangshan Town, Luozhuang District, Linyi City

Phase IV Integrated Photovoltaic Poverty Alleviation Project of Huangshan Town, Luozhuang District, Linyi City

675.2kw

3 million yuan

2020.6.28

 

Scan the QR code to read on your phone
We could not find any corresponding parameters, please add them to the properties table
Next

Shantian abrasive Co., Ltd.

Copyright © 2020  Shantian New Materials Group Co., Ltd. All rights reserved  Powered by  www.300.cn  鲁ICP备11015787号